How can we connect 2 columns by a beam when house construction and finishing completed?
Let's suppose the distance between 2 coloumn is 12 ft or 4 meter. Than it is must for your house to provide beam so slab can rest & transfer the load properly.
STEP 1 : Planning
Case : 1 : If the beam is to be constructed on floor or plinth area.
- Fix a support to the wall which prevents wall tilting.
- Mark the level where beam is to be laid. (Mark on wall)
- Free the space or displace heavy load from that wall.
- Make point and cut the wall in upcoming beam area.
- Provide proper reinforcement.
- Fix shuttering easily.
- Hire a expert meson or technician.
- Concrete should be properly mixed and proportion should be designed.
- Use vibrator during concrete.
Case : 2 If the upcoming beam will under the roof than :
- Mark the level of beam.
- Cut the wall carefully.
- Make support to the roof by shaft/ timber/ metal suport.
- Fix shuttering carefully.
- Provide reinforcement properly.
- Start concrete with care.
- Make proper support to the roof.
- Don't out any pointed or imposed load to the roof like, furniture, household appliances, water tank Etc.
DISCLAIMER All The Information are posted in this website are best for my knowledge. These blog post are collected by various sources i.e. Official Documents/ Related Books/ Newspaper/ Related Website/ Government Notices/ Circulars and other reliable sources. Download any documents at your own interest, we do not refund or compensation any Amount against the Payment you have done. We do not Agree/ Responsible with its authenticity, all blog post in this website are only for information purpose. Any legal action against this Blog post are strictly at your own risk. Click Here to read our complete disclaimer. |