The finishing of a house is the final stage of construction that gives durability and functionality to the structure. The finishing work transforms a structure into a comfortable and attractive home.
Finishing is not only about the aesthetic look of a house, it also gives comfort, durability, safety and valuation to the property. Structure may build a house, but finishing work makes a home. Quality check is important during and after finishing works ensure a safer, functional and long lasting living space.
For homeowners, here are 7 methods for checking the finishing quality of a newly constructed house or Flat :
1. Door Works
Alignment: |
Ensure proper alignment of all door shutters including main doors, bedroom doors and toilet doors. |
Smooth
Movement: |
All doors should move smoothly. Check that hinges, locks, and other hardware function without obstruction. |
Hardware
Cleaning: |
All hardware must be thoroughly
cleaned and free from paint, polish stains, and dents. |
Polish
Finish: |
Door polish should not overlap onto
laminate or painted surfaces. |
Top
Bidding Patti: |
The top bidding of all shutters should
be properly polished. |
Main
Door Grooves: |
Grooves on the main door shutter must
be polished neatly and evenly |
Hardware
Completeness: |
Verify that all required hardware is
installed and complete |
2. Window Works
Glass Cleaning: |
Window glass should be cleaned using soft materials such as paper, cloth etc. Avoid using abrasive or sharp tools. |
Protective Plastic Removal: |
Remove all protective plastic film from the window shutter and track. Do not use sharp objects like blades or metal scrapers to prevent surface damage. |
Smooth Sliding Operation: |
Ensure that the window shutters slide
smoothly without any obstruction. |
Lock Functionality: |
Locks should operate properly and
allow for smooth and secure closing |
Drain Hole Inspection: |
Confirm that all drain holes are clear
and functional before window installation. |
Wool Pile & Gasket Placement: |
Wool pile and gaskets must be correctly fixed and aligned with the glass to ensure proper sealing. |
Silicone Sealing: |
Silicone sealant should be applied in
a continuous manner without any gaps. |
Shutter Hole Capping: |
All exposed holes in the shutter
should be properly sealed with PVC caps |
3. Painting Works
Paint Finish on Skirting Tops: |
Ensure a clean and uniform paint
finish over the top of all skirting. All surfaces should be free from dust,
debris, or sediments before painting. |
Granite Patti Projections: |
Paint must be neatly finished around
granite patti projections, with no smudging or overlap. |
Kitchen Dado Top: |
Ensure a clean and consistent paint
finish along the top edge of the kitchen dado. |
Surface Quality Check: |
Inspect painted surfaces for
undulations, unevenness, or visible brush marks around door frames and window
edges where workmanship is often overlooked. |
Wall Finish Inspection: |
Check all wall surfaces for waviness, patchy textures, or inconsistencies in the paint finish. |
4. Tiling, Granite, Marble Works
Hollowness Check: |
Flooring and toilet wall dado have
been checked for hollowness using tapping methods to identify any loose or
improperly bonded tiles. |
Slope Verification: |
Verified the slope of bathroom and
kitchen platforms to ensure proper water drainage toward the outlets and
avoid water stagnation |
Joints and Gaps: |
All
joints of platform should be filled with black grout. All
Gaps around sink should be properly filled. All
tile joints should be filled with cementitious grout. Joints of kitchen platform vertical & Tile should be filled with properly filled with grout. |
5. Bathroom Finishing Works
Slope Check: |
Verify the flooring slope by pouring a
bucket of water to ensure proper drainage toward the floor trap. |
Grouting of Joints: |
All tile joints must be filled with cementitious grout. Special attention should be given to tile drop areas. check for alignment and gaps using a paper cutter. |
Acid Usage Restriction: |
Acid cleaning is strictly prohibited
after Chrome Plated fittings are installed to prevent damage. |
WC Seat Cover Installation: |
The toilet seat cover should be
installed one day prior to handover/possession. |
Sanitary Joint Sealing: |
All joints around sanitary fixtures
must be sealed with white cement for a clean and durable finish. |
Granite Jamb Inspection: |
Inspect all toilet granite jambs for
any visible cracks or damages. |
Double Patti Grouting:
|
Gaps between double patti (granite or
tile) must be properly filled with grout. |
False Ceiling Alignment: |
Ensure all false ceiling sheets are
properly aligned and securely fixed. |
6. Electrical Works
Electric Switches: |
Ensured proper alignment of electric
switchboards for aesthetics and functionality. |
7. Plumber Works
Plumbing Shaft: |
Plumbing shaft Painted & Cleaned
before handover. Plumbing line pressure testing to be
done post completion of MEP work & before the flat possession. |
Plumbing Fixtures: |
The plumbing fixtures and accessories must
be standard.
|
DISCLAIMER All The Information posted on this website is best for my knowledge. These blog posts are collected by various sources, i.e. Official Documents/ Related Books/ Newspaper/ Related Website/ Government Notices/ Circulars, and other reliable sources. Download any documents at your own interest; we do not offer refunds or any compensation against the amount you have paid. We do not agree/ Responsible for its authenticity; all blog posts on this website are only for information purposes. Any legal action against this Blog post is strictly at your own risk. Click Here to read our complete disclaimer. |