FIB Bulletin - 58, Design of Anchorages in Concrete represents modern fastening technique for the transfer of concentrated loads into concrete and masonry structures. Cast-in-place anchors, placed in the formwork before casting of the concrete, and post-installed systems, which are installed in hardened structural concrete or masonry.

Loads are transferred into the concrete or masonry by mechanical interlock, friction, bond or a combination of these mechanisms. The load-transfer mechanism, all anchorages rely on the tensile strength of the concrete or masonry, a fact which must be taken into account in both assessment and design. 

The following significant additions and revisions are incorporated in this document-

  • new section on the design of bonded anchors and connections with post-installed reinforcing bars.
  • a new section addressing the design of anchor channels.
  • a new section on the design of anchorages for fire.
  • a new section on the design of anchorages under earthquake loading.
  • inclusion of detailed design provisions for anchorages subjected to fatigue loading.
  • significantly improved design provisions for the critical case of shear-loaded anchorages close to edges.
  • improved design provisions for combined tension and shear loading. 


____________

DISCLAIMER

All The Information are posted in this website are best for my knowledge. These blog post are collected by various sources i.e. Official Documents/ Related Books/ Newspaper/ Related Website/ Government Notices/ Circulars and other reliable sources. 

Download any documents at your own interest, we do not refund or compensation any Amount against the Payment you have done. 

We do not Agree/ Responsible with its authenticity, all blog post in this website are only for information purpose. Any legal action against this Blog post are strictly at your own risk.

Click Here to read our complete disclaimer.

CIVILSHAPE ADMIN

Er. Priyanshu Gandhi (Admin) has vast experience in Post Tensioning/ Stay Cable Systems for Pre-cast and In-situ infrastructure, Metro rail, Bridges, Buildings. He has driven efficiency, safety compliance and timely Project delivery over the last 7 years.

Post a Comment

Previous Post Next Post